Members of SRT Tau-2 by the north perimeter of Site-102, imaged 01/██/2021
Special Containment Procedures: Pending containment evaluation and decommission, Strategic Removal Teams (SRTs) en route to Site-102 should be flagged and advised to approach from the south.
No further action is needed at this time. Containment evaluation is scheduled on: 06/19/2023 09/20/2023 01/09/2024 N/A. Containment procedures may be affected.
Signage should be used to deter civilian trespassing.
Description: SCP-XXXX is a collection of unexploded ordnance (UXO) situated on the north perimeter of Site-102, consisting of no more than 208 199 live BLU-92/B anti-personnel land mines and covering an area of 4 square kilometers. SCP-XXXX instances display a range of anomalous effects on detonation.
SCP-XXXX was initially created as a non-anomalous containment failsafe in ██/██/1989 using standard GATOR cluster dispensers. Its current properties are believed to be a result of the use of untested disposal methods shortly following the passing of the 2020 Emergency Pacification Act. SCP-XXXX was classified following investigation after its first recorded detonation in 10/██/2020.
As of 01/██/2021, 2 detonations have been recorded. The full extent of these effects and their variation between individual instances is not known.
Event Log:
| Date | Effects | Notes |
| 10/██/2020 | One instance detonated. No explosion was observed, but the individual presented with severe burns on the feet and lower legs. | Unintended detonation during routine SRT deployment. |
| 01/██/2021 | One instance detonated. The observed centre of explosion was displaced from the instance by over 10 meters. | Controlled remote detonation by SRT Tau-2, resulting in 1 fatality and 2 severely injured. Further testing is put on hold. |
l
UPDATE: 03/25/2023
This message has been automatically pinned to all relevant documentsSite-102 is no longer in operation and is scheduled for concreting on: 07/03/2023. Any remaining items tagged as 'active' should be relocated to Permanent Holding Facility: C prior to final inspection.
Site Risk Statistics
Remaining items classed 'Critical': 2
Remaining items classed 'Danger': 6
Remaining items classed 'Warning', lower or unclassified: 21
Final verdict: Ongoing
Supplementary SRT Report (Internal): 03/25/2023
This message has been automatically pinned to all relevant documentsLocation: Site-102
Team lead: B. ██████, SRT Tau-1We've finished clearing the site with minimal resistance. Here are the items prepped for transfer:
- SCP-████
- SCP-████ (actively hostile)
- SCP-███
- SCP-████-1
- SCP-████-2
- SCP-████
I've attached the vehicle specs below. Team 2 are handling acquisition, and the rest of you will handle logistics and transport. The twisted fucks down at max will take it from there. Let's get this shit wrapped up and done with.
If your orders don't come through by morning, let us know. We're still getting to grips with the new system.
1 attached file: [LINK EXPIRED]
l
l
UPDATE: 07/10/2023
This message has been automatically pinned to all relevant documentsSite-102 has been successfully decommissioned. All relevant documents have been flagged for redaction and archiving. Please allow up to a week to complete.
SRT Tau-2 have been reassigned to Permanent Holding Facility C for: engineering consultation.
Site Risk Statistics
Remaining items classed 'Critical': 0
Remaining items classed 'Danger': 2, inaccessible
Remaining items classed 'Warning', lower or unclassified: 21, 20 inaccessible
Final verdict: Acceptable






Per 


