“The Cross That Duplicates.. You”
[[iftags -component-backend]]
[[/iftags]]
[[/iftags]]
[[iftags +component-backend]]
Check Page Source for Code
[[/iftags]]
SCP-5633 requires extensive monitoring and regulation. As such, a staff of at least six members must be assigned at Site Mu-18 with any expected or unexpected absence replaced within a day’s time. Chosen staff must not be haemophobic to any degree.
Every 18th day, starting from January 18, 1837, the pressure release from SCP-5633 is activated until atmospheric pressure within SCP-5633-α is within 1.22 Bar. During this procedure, the liquid excreted from the outlet is collected and tested against a strong electrical force. If this liquid conducts enough electrical force to power the vestigial lights within the extended Site Mu-18, the liquid within SCP-5633 must be drained and replaced within 12 hours.[[/div]]






Per 


